Skip to the main content

Ask A Question

Need an answer but don’t know who to talk to? Drop your questions in the form field. We’ll pass it along to our in-house experts, and an answer will be emailed to you shortly.

* Required
* Required
24-ounce Traex® FIFO clear squeeze dispenser with white FlowCut™ cap and clear base cap

490242-130513

24-ounce Traex® FIFO clear squeeze dispenser with white FlowCut™ cap and clear base cap

  • Made in USA
  • National Sanitation Foundation
$7.26 MSRP Manufacturer Suggested Retail Price (MSRP) is a predetermined percentage off of list price (shown is US Dollars) and is valid for vollrathfoodservice.com and the United States and Canada only. Dealer pricing may differ. These prices do not include potential shipping costs. Any sales tax applicable will be added to the final price upon quote or purchase.
$12.10 List Price List price (shown is US Dollars) is valid for vollrathfoodservice.com and the United States and Canada only. Dealer pricing may differ. These prices do not include potential shipping costs. Any sales tax applicable will be added to the final price upon quote or purchase.

Serve the freshest condiments with confidence from the Traex® first-in/first-out squeeze dispenser. Traex® FIFO squeeze dispensers fill from the bottom but dispense from the top, for improved food safety and less waste. The clear 24-ounce bottle enhances product visibility, and a wide mouth on each end makes refilling and cleaning easy. The FlowCut™ cap turns dispensing upside down, allowing you to store the bottle dispenser side down for a constant flow and less waste when product is low.

  • White flip-top cap and clear twist end cap
  • FlowCut™ cap has a patented silicone valve flip top for easy squeezing and dispensing with the bottle upside down
  • Colored storage base cap system prevents cross-contamination
  • Embossed graduated design simplifies portion tracking
  • Tight, no-leak seals help prevent spills and messes
  • Date code on storage base cap helps ensure safety and freshness
  • BPA-free polyethylene is NSF-certified and dishwasher-safe
  • Made in USA

Product Specifications

Engineering front view
Engineering top view
Model Information
Name Value
UPC 029419643097
Unit Dimensions
Name Value
(W) Width (IN) 2.98
(D) Depth (IN) 2.98
(H) Height (IN) 10.63
(DI) Diameter 2.98
(W) Width (CM) 7.57
(D) Depth (CM) 7.57
(H) Height (CM) 27
(DI) Diameter (CM) 7.57
Volume
Name Value
Capacity (L) 0.71
Capacity (OZ) 24
Construction
Name Value
Bottle Color Clear
Color Clear/Clear
Construction Material Polyethylene
Top Color Clear
Product Function Squeeze Dispenser

CAD / REVIT

For the most updated list for Vollrath products and CAD drawings

Visit VOLLRATH.KCLCAD.COM

Customer Questions

Be the first to ask a question